Shopbewertung - steckerladen.de PayPal LogoMitglied im Händlerbund
Deutsch English

business vacation from 19.12.2024 to 05.01.2025

Harting

Show 121 to 144 (of in total 2400 products)
 
Han 10A housing, surface mounting
Han 10A surface mounted housing
low construction
side entry 2 x M20
single locking lever
Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 15,78 EUR
from 10 pcs.per 13,29 EUR
from 50 pcs.per 12,77 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A male insert 0,75 - 2,5 mm˛

with screw terminal
250 V / 16 A
10 poles + PE
for: 0,75 - 2,5 mm˛

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 13,05 EUR
from 10 pcs.per 9,59 EUR
from 50 pcs.per 8,08 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A male insert 0,75 - 2,5 mm˛

with screw terminal
250 V / 16 A
10 poles + PE
for: 0,75 - 2,5 mm˛

Shipping time: 10-12 weeks
QtyPrice
from 1 pcs.per 14,20 EUR
from 10 pcs.per 10,44 EUR
from 50 pcs.per 8,79 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A male insert, crimp, 0,14 - 4 mm˛

with crimp terminal
250 V / 16 A
10 poles + PE
for:  0,14 - 4 mm˛

Han A crimp contacts have to be ordered separately

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 12,31 EUR
from 10 pcs.per 9,04 EUR
from 50 pcs.per 7,63 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A protection cover for hoods, metal, with fixing cord

Han 10A protection cover for hoods
with fixing cord
metal
low and high construction
single locking lever

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 23,42 EUR
from 10 pcs.per 17,21 EUR
from 50 pcs.per 14,50 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A surface mounted housing, side entry, 1xM25, grey

Han 10A surface mounted housing
low construction
single locking lever
side entry, 1 x M25
aluminium die-cast, powder-coated

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 14,58 EUR
from 10 pcs.per 12,29 EUR
from 50 pcs.per 11,79 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10A surface mounted housing, with thermo-plastic cover, side entry, 2xM20

Han 10A surface mounted housing
with thermo-plastic cover
side entry, 2xM20
high construction
single locking lever

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 48,33 EUR
from 10 pcs.per 35,50 EUR
from 50 pcs.per 29,94 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B  cable to cable housing, top entry, 1xM20, double locking lever

Han 10B  cable to cable housing
top entry, 1xM20
double locking lever
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 22,01 EUR
from 10 pcs.per 16,16 EUR
from 50 pcs.per 13,63 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B bulkhead mounted housing, central locking lever (on the hood)

Han B bulkhead mounted housing
central locking lever (on the hood)
low construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 20,31 EUR
from 10 pcs.per 17,09 EUR
from 50 pcs.per 16,41 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B bulkhead mounted housing, single locking lever

Han 10B bulkhead mounted housing
single locking lever
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 19,25 EUR
from 10 pcs.per 14,16 EUR
from 50 pcs.per 11,93 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B bulkhead mounted housing, with metal cover, single locking lever

Han 10B bulkhead mounted housing
with metal cover
single locking lever
low construction

Shipping time: 10-12 weeks
QtyPrice
from 1 pcs.per 34,09 EUR
from 10 pcs.per 25,04 EUR
from 50 pcs.per 21,11 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B bulkhead mounted housing, with thermo-plastic cover, single locking lever

Han 10B bulkhead mounted housing
with thermo-plastic cover
single locking lever
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 23,39 EUR
from 10 pcs.per 17,18 EUR
from 50 pcs.per 14,94 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B cable to cable housing, top entry, 1xM20, single locking lever

Han 10B cable to cable housing,
top entry, 1 x M20
single locking lever,
low construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 18,16 EUR
from 10 pcs.per 15,28 EUR
from 50 pcs.per 14,67 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B cable to cable housing, top entry, 1xM25, single locking lever, high construction

Han 10B cable to cable housing,
top entry, 1 x M25,
single locking lever,
high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 41,46 EUR
from 10 pcs.per 36,29 EUR
from 50 pcs.per 35,44 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B cable to cable housing, top entry, 1xM32, single locking lever, high construction

Han 10B cable to cable housing,
top entry, 1 x M32,
single locking lever,
high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 55,28 EUR
from 10 pcs.per 43,27 EUR
from 50 pcs.per 39,49 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B Drive housing for motor application, powder coated, with thermo-plastic cover, single locking lever, 70mm

Han 10B Drive housing for motor application,
powder coated
with thermo-plastic cover,
single locking lever
Han-Easy lock
Distance assembly fixing holes: 70 mm

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 33,68 EUR
from 10 pcs.per 31,72 EUR
from 50 pcs.per 30,98 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B Drive housing for motor application, powder-coated, single locking lever

Han 10B Drive housing for motor application,
powder-coated
single locking lever
Han-Easy lock
 

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 32,33 EUR
from 10 pcs.per 30,46 EUR
from 50 pcs.per 29,75 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B Drive housing for motor application, single locking lever

Han 10B Drive housing for motor application,
single locking lever
Han-Easy lock
Distance assembly fixing holes: 73 mm

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 31,11 EUR
from 10 pcs.per 30,79 EUR
from 50 pcs.per 30,07 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood top entry, 1xM25, single locking lever
Han 10B hood
top entry, 1 x M25
single locking lever
low construction
 
Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 17,51 EUR
from 10 pcs.per 12,86 EUR
from 50 pcs.per 11,19 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood top entry, 2xM20, single locking lever, high construction
Han 10B hood
top entry, 2 x M20
single locking lever
high construction
 
Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 29,69 EUR
from 10 pcs.per 23,25 EUR
from 50 pcs.per 20,57 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood, side entry, 1xM20, double locking lever

Han 10B hood
side entry, 1xM20
double locking lever
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 16,83 EUR
from 10 pcs.per 10,64 EUR
from 50 pcs.per 8,21 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood, side entry, 1xM20, double locking lever (on the hood)

Han 10B hood
side entry, 1 x M20
double locking lever (on the hood)
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 24,36 EUR
from 10 pcs.per 15,39 EUR
from 50 pcs.per 11,87 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood, side entry, 1xM20, single locking lever

Han 10B hood
side entry, 1 x M20
single locking lever
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 13,93 EUR
from 10 pcs.per 10,25 EUR
from 50 pcs.per 8,62 EUR
19 % VAT plus. excl. Shipping costs
 
Han 10B hood, side entry, 1xM25, central locking lever (on the hood), high construction

Han 10B hood,
side entry, 1xM25,
central locking lever (on the hood),
high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 40,04 EUR
from 10 pcs.per 33,71 EUR
from 50 pcs.per 32,36 EUR
19 % VAT plus. excl. Shipping costs
Show 121 to 144 (of in total 2400 products)