Shopbewertung - steckerladen.de PayPal LogoMitglied im Händlerbund
Deutsch English

business vacation from 19.12.2024 to 05.01.2025

Harting Han 24B M Housings

MaterialAluminium die-cast
RAL 9005 (black)
Locking elementStainless steel
Hoods/Housings sealFPM
Limiting Temperature-40°C ... +125°C
Degree of protection for coupled connectorsIP 65
Show 1 to 17 (of in total 17 products)
  • Sites:
  • 1
 
Han M 24B hood, top entry, 1xM25, double locking lever

Han M 24B hood,
top entry, 1 x M25,
double locking lever,
low construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 43,01 EUR
from 10 pcs.per 33,67 EUR
from 50 pcs.per 29,80 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, top entry, 1xM32, double locking lever, high construction

Han M 24B hood,
top entry, 1 x M32,
double locking lever,
high construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 49,18 EUR
from 10 pcs.per 38,49 EUR
from 50 pcs.per 35,13 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, top entry, 1xM40, double locking lever, high construction

Han M 24B hood,
top entry, 1 x M40,
double locking lever,
high construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 49,18 EUR
from 10 pcs.per 38,49 EUR
from 50 pcs.per 35,13 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, top entry, 2xM25, double locking lever, high construction

Han M 24B hood,
top entry, 2 x M25,
double locking lever,
high construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 70,59 EUR
from 10 pcs.per 51,87 EUR
from 50 pcs.per 43,71 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, top entry, 2xM32, double locking lever, high construction

Han M 24B hood,
top entry, 2 x M32,
double locking lever,
high construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 70,59 EUR
from 10 pcs.per 51,87 EUR
from 50 pcs.per 43,71 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, side entry, 1xM25, double locking lever

Han M 24B hood,
side entry, 1 x M25,
double locking lever,
low construction
for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 39,18 EUR
from 10 pcs.per 30,67 EUR
from 50 pcs.per 27,15 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, side entry, 1xM32, double locking lever, high construction

Han M 24B hood,
side entry, 1 x M32,
double locking lever,
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 44,64 EUR
from 10 pcs.per 32,80 EUR
from 50 pcs.per 27,64 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, side entry, 1xM40, double locking lever, high construction

Han M 24B hood,
side entry, 1 x M40,
double locking lever,
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 44,64 EUR
from 10 pcs.per 34,94 EUR
from 50 pcs.per 31,90 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B housing, surface mounting

for higher environmental requirements

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 72,30 EUR
from 10 pcs.per 60,88 EUR
from 50 pcs.per 58,42 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B surface mounted housing, side entry, 2xM32, double locking lever, high construction

Han M 24B surface mounted housing,
side entry, 2 x M32,
double locking lever,
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 70,71 EUR
from 10 pcs.per 59,55 EUR
from 50 pcs.per 57,14 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B cable to cable housing, side entry, 1xM40, double locking lever, high construction

Han M 24B cable to cable housing,
side entry, 1 x M40,
double locking lever,
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 73,80 EUR
from 10 pcs.per 64,59 EUR
from 50 pcs.per 63,08 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B cable to cable housing, side entry, 1xM40, double locking lever, high construction

Han M 24B cable to cable housing,
side entry, 1 x M40,
double locking lever,
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 60,83 EUR
from 10 pcs.per 53,26 EUR
from 50 pcs.per 52,00 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B protection cover for bulkhead and surface mounted and cable to cable housing, metal, with fixing cord, double locking lever

Han M 24B protection cover
for bulkhead and surface mounted housing
and for cable to cable housing,
metal, with fixing cord,
double locking lever
for rough environments
low and high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 30,12 EUR
from 10 pcs.per 25,36 EUR
from 50 pcs.per 24,34 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, top entry, 1xM32, central locking lever (on the hood), high construction

Han M 24B hood,
top entry, 1 x M32,
central locking lever (on the hood),
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 90,71 EUR
from 10 pcs.per 66,64 EUR
from 50 pcs.per 56,18 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B hood, side entry, 1xM32, central locking lever (on the hood), high construction

Han M 24B hood,
side entry, 1 x M32,
central locking lever (on the hood),
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 89,59 EUR
from 10 pcs.per 70,12 EUR
from 50 pcs.per 62,08 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B bulkhead mounted housing, central locking lever (on the hood),

Han M 24B bulkhead mounted housing,
central locking lever (on the hood),
low construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 77,01 EUR
from 10 pcs.per 64,85 EUR
from 50 pcs.per 62,24 EUR
19 % VAT plus. excl. Shipping costs
 
Han M 24B surface mounted housing, side entry, 2xM32, central locking lever (on the hood), high construction

Han M 24B surface mounted housing,
side entry, 2 x M32,
central locking lever (on the hood),
high construction
for rough environments

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 76,84 EUR
from 10 pcs.per 64,71 EUR
from 50 pcs.per 62,10 EUR
19 % VAT plus. excl. Shipping costs
Show 1 to 17 (of in total 17 products)
  • Sites:
  • 1