Shopbewertung - steckerladen.de PayPal LogoMitglied im Händlerbund
Deutsch English

business vacation from 19.12.2024 to 05.01.2025

Harting Han 24B Housings double locking lever (on the hood), 2 Locking clips at hood

MaterialAluminium die-cast
RAL 7037 (grey)
Locking elementStainless steel
Hoods/Housings sealNBR
Limiting Temperature-40°C ... +125°C
Degree of protection for coupled connectorsIP 65
Show 1 to 11 (of in total 11 products)
  • Sites:
  • 1
 
Han 24B hood, top entry, 1xM32, double locking lever (on the hood)

Han 24B hood,
top entry, 1 x M32,
double locking lever (on the hood),
low construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 29,16 EUR
from 10 pcs.per 18,42 EUR
from 50 pcs.per 14,21 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B hood, top entry, 1xM32, double locking lever (on the hood), high construction

Han 24B hood,
top entry, 1 x M32,
double locking lever (on the hood),
high construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 31,08 EUR
from 10 pcs.per 22,83 EUR
from 50 pcs.per 19,24 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B hood, top entry, 1xM40, double locking lever (on the hood), high construction

Han 24B hood,
top entry, 1 x M40,
double locking lever (on the hood),
high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 46,61 EUR
from 10 pcs.per 29,44 EUR
from 50 pcs.per 22,71 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B hood, side entry, 1xM25, double locking lever (on the hood)

Han 24B hood, 
side entry, 1 x M25,
double locking lever (on the hood),
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 27,22 EUR
from 10 pcs.per 17,18 EUR
from 50 pcs.per 13,25 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B hood, side entry, 1xM32, double locking lever (on the hood), high construction

Han 24B hood,
side entry, 1 x M32,
double locking lever (on the hood),
high construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 38,33 EUR
from 10 pcs.per 28,17 EUR
from 50 pcs.per 23,74 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B bulkhead mounted housing, with thermo-plastic cover, double locking lever (on the hood)

Han 24B bulkhead mounted housing,
with thermo-plastic cover,
double locking lever (on the hood)
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 23,39 EUR
from 10 pcs.per 17,18 EUR
from 50 pcs.per 14,94 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B bulkhead mounted housing, with metal cover, double locking lever (on the hood)

Han 24B bulkhead mounted housing,
with metal cover,
double locking lever (on the hood)
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 42,32 EUR
from 10 pcs.per 26,73 EUR
from 50 pcs.per 20,62 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B surface mounted housing, with thermo-plastic cover, side entry, 1xM25, double locking lever (on the hood)

Han 24B surface mounted housing,
with thermo-plastic cover,
side entry, 1 x M25,
double locking lever (on the hood)
low construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 35,68 EUR
from 10 pcs.per 24,47 EUR
from 50 pcs.per 19,66 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B surface mounted housing, with thermo-plastic cover, side entry, 2xM25, double locking lever (on the hood)

Han 24B surface mounted housing,
with thermo-plastic cover,
side entry, 2 x M25,
double locking lever (on the hood)
low construction

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 35,41 EUR
from 10 pcs.per 26,56 EUR
from 50 pcs.per 22,42 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B surface mounted housing, with thermo-plastic cover, side entry, 1xM32, double locking lever (on the hood), high construction

Han 24B surface mounted housing,
with thermo-plastic cover,
side entry, 1 x M32,
double locking lever (on the hood),
high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 54,88 EUR
from 10 pcs.per 37,63 EUR
from 50 pcs.per 30,23 EUR
19 % VAT plus. excl. Shipping costs
 
Han 24B protection cover for hoods, metal, with fixing cord, double locking lever (on the hood)

Han 24B protection cover for hoods,
metal,
with fixing cord,
double locking lever (on the hood)
low and high construction

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 35,21 EUR
from 10 pcs.per 25,86 EUR
from 50 pcs.per 21,80 EUR
19 % VAT plus. excl. Shipping costs
Show 1 to 11 (of in total 11 products)
  • Sites:
  • 1