Shopbewertung - steckerladen.de PayPal LogoMitglied im Händlerbund
Deutsch English

business vacation from 19.12.2024 to 05.01.2025

Harting Han 6B Housings

MaterialAluminium die-cast
RAL 7037 (grey)
Locking elementStainless steel
Hoods/Housings sealNBR
Limiting Temperature-40°C ... +125°C
Degree of protection for coupled connectorsIP 65
Show 25 to 38 (of in total 38 products)
 
Han 6B cable to cable housing, top entry, 1xM20

Han 6B cable to cable housing
top entry, 1 x M20
low construction
single locking lever

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 18,77 EUR
from 10 pcs.per 15,80 EUR
from 50 pcs.per 15,18 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B cable to cable housing, top entry, 1xM25, high construction

Han 6B cable to cable housing
top entry, 1 x M25
high construction
single locking lever
 

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 18,73 EUR
from 10 pcs.per 15,78 EUR
from 50 pcs.per 15,14 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B cable to cable housing, top entry, 1xM32, high construction

Han 6B cable to cable housing
top entry, 1 x M32
high construction
single locking lever
 

Shipping time: 13-52 weeks
QtyPrice
from 1 pcs.per 24,99 EUR
from 10 pcs.per 21,32 EUR
from 50 pcs.per 20,83 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B panel feed through housing, top entry, 1xM25, high construction

Han 6B panel feed through housing
top entry, 1 x M25
high construction
single locking lever
 

Shipping time: 4-8 weeks
QtyPrice
from 1 pcs.per 34,83 EUR
from 10 pcs.per 27,26 EUR
from 50 pcs.per 24,14 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B panel feed through housing, top entry, 1xM32, high construction

Han 6B panel feed through housing
top entry, 1 x M32
high construction
single locking lever
 

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 34,83 EUR
from 10 pcs.per 27,26 EUR
from 50 pcs.per 24,14 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B flange housing, top entry, 1xM25

Han 6B flange housing
top entry, 1 x M25
low construction
single locking lever

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 32,82 EUR
from 10 pcs.per 27,63 EUR
from 50 pcs.per 26,52 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B protection cover for hood, with fixing cord
Han 6B protection cover for hood
with fixing cord
low and high construction
Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 25,44 EUR
from 10 pcs.per 17,44 EUR
from 50 pcs.per 14,01 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B protection cover for bulkhead and surface mounted housings, thermoplastic
Han 6B protection cover
for bulkhead mounted and surface mounted housings
Thermoplastic
low and high construction
single locking lever
Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 6,47 EUR
from 10 pcs.per 5,45 EUR
from 50 pcs.per 5,24 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B protection cover, for bulkhead and surface mounted housings, metal, with fixing cord
Han 6B protection cover, for bulkhead and surface mounted housings,
metal, with fixing cord
low and high construction
single locking lever
Shipping time: 21-63 days
QtyPrice
from 1 pcs.per 11,75 EUR
from 10 pcs.per 8,62 EUR
from 50 pcs.per 7,27 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B protection cover for cable to cable housings, metal, with fixing cord

Han 6B protection cover for cable to cable housing,
metal, with fixing cord
low and high construction
single locking lever

Shipping time: 2-4 days
QtyPrice
from 1 pcs.per 18,69 EUR
from 10 pcs.per 13,73 EUR
from 50 pcs.per 11,95 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B hood, side entry, 1xM25, high construction, central locking lever (on the hood)
Han 6B hood
side entry, 1 x M25
high construction
central locking lever (on the hood)
Shipping time: 21-63 days
QtyPrice
from 1 pcs.per 42,41 EUR
from 10 pcs.per 35,72 EUR
from 50 pcs.per 34,27 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B bulkhead mounted housing, central locking lever (on the hood), low construction

Han 6B bulkhead mounted housing
central locking lever (on the hood)
low construction

Shipping time: 4-8 weeks
QtyPrice
from 1 pcs.per 17,07 EUR
from 10 pcs.per 14,37 EUR
from 50 pcs.per 13,80 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B panel feed through housing, top entry, 1xM25, high construction, central locking lever (on the hood)

Han 6B panel feed through housing
top entry, 1 x M25
high construction
central locking lever (on the hood)

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 35,31 EUR
from 10 pcs.per 27,63 EUR
from 50 pcs.per 24,47 EUR
19 % VAT plus. excl. Shipping costs
 
Han 6B panel feed through housing, top entry, 1xM32, high construction, central locking lever (on the hood)

Han 6B panel feed through housing
top entry, 1 x M32
high construction
central locking lever (on the hood)

Shipping time: 8-14 days
QtyPrice
from 1 pcs.per 35,31 EUR
from 10 pcs.per 27,63 EUR
from 50 pcs.per 24,47 EUR
19 % VAT plus. excl. Shipping costs
Show 25 to 38 (of in total 38 products)